For all types of balancing services (FCR, aFRR, mFRR), the prequalification is carried out exclusively by the TSO in whose Load-Frequency Control (LFC) area the relevant technical units (power generation plants and/or consumption units) are connected to the grid, regardless of the voltage level (the so-called connecting TSO). You can find the key steps of the prequalification in the process diagram above.
Prequalified providers
Here you can download a list of all prequalified providers.
Anbieterliste Regelleistung
PQ services in Germany
The current overview of prequalified capacity by balancing services is as follows. A more detailed list and a depiction of the development of prequalified capacity in Germany over the years can be found here.